I. Pre-Commissioning Preparation and Safety Inspection
The coordinated commissioning of the industrial water system and the compressed air compressor room is a critical step in ensuring power supply to the plant. Before executing the operation ticket, a comprehensive technical briefing and safety confirmation must be completed. All personnel involved must be familiar with the system procedures, wear approved personal protective equipment, and verify that electrical insulation tools and measuring instruments are within their valid calibration periods.
- Document Review:Confirm that the design drawings, equipment manuals, commissioning plan, and emergency response plan have been filed for record.
- On-site cleanup:Inspect the utility tunnels and equipment foundations to ensure no debris is accumulated, drainage ditches are unobstructed, and fire access routes remain free of obstructions.
- Instrument verification:The pressure transmitter, flow meter, temperature sensor, and interlock protection device have completed individual commissioning and are functioning normally.
II. Start-up and Shut-down Procedures for Industrial Water Systems
Industrial water systems encompass raw water pretreatment, recirculating cooling, and the water supply network. Upon commissioning, the principle of “open first, then close” and staged loading should be followed to prevent water hammer from damaging pipes and valves.
- Pump priming and air venting:Open the water inlet valve, and slowly open the air vent until water flows continuously; once you have confirmed that all air has been purged from the pump chamber, close the vent.
- jog test:Briefly start the motor to verify correct rotation direction and listen for any abnormal friction noises from the bearings and seals.
- Step-by-step pressurization operation:Slowly open the outlet valve, monitor that the motor current does not exceed its rated value, and adjust until the system operates within the design flow and head range.
- Pipe network balancing:Open the branch valves section by section by zone, record pressure data at each node, locate leak points, and tighten flange connections.
III. Commissioning Procedures for the Air Compressor Room
Compressed air stations provide a stable air supply for pneumatic control and manufacturing equipment. During commissioning, it is essential to strictly monitor the intake air quality, lubrication condition, and exhaust air quality.
- Host Precheck:Check that the oil level sight glass reading is between the standard marks, and manually turn the shaft two revolutions to confirm that the rotor rotates smoothly without binding.
- Auxiliary Machine Interlock:Start the cooling fan, lubrication oil pump, and temperature control valve in sequence; only after the oil temperature reaches the set threshold may the main motor be started.
- Load Regulation:After running unloaded for twenty minutes, gradually switch to load mode and verify that the discharge pressure remains stable and meets process requirements.
- Gas holder commissioning:Open the inlet and outlet valves of the buffer tank, periodically drain condensate, and ensure that the pressure differential across the dryer and filter remains within the allowable range.
IV. Joint Commissioning, Integrated Testing, and Handover Acceptance
During the dual-system synchronous operation phase, cross‑impact and emergency switchover functions must be rigorously verified. Operators shall continuously record key parameters, including voltage fluctuations, water turbidity, dew point temperature, and vibration spectra.
- Load Simulation:Gradually increase water and gas consumption to 80% of the design capacity to verify the automatic matching capability of pump and turbine units.
- Protection test:Manually trigger fault signals such as overpressure, phase loss, and high temperature, and verify that the emergency shutdown circuit operates promptly and that the reset logic is correct.
- Transfer of Materials:Organize the commissioning report, calibration certificates, spare parts list, and operation training records, and complete the mutual sign-off procedures.
V. Operating Precautions
Routine inspections and maintenance are essential for extending equipment lifespan. On-duty personnel must strictly adhere to scheduled meter-reading protocols, paying particular attention to the integrity of pipe insulation and the temperature rise at electrical terminals. If unusual noises, leaks, or parameter deviations are detected, load-reduction procedures must be initiated immediately; forced operation under fault conditions is strictly prohibited. Filter elements and lubricating oil should be replaced regularly, and a full lifecycle record system should be established to support preventive maintenance.