I. Safety Checks Before Startup
Screw air compressors are high-pressure power equipment, and adherence to standardized operating procedures is essential for ensuring the safety of personnel and equipment. Before energizing and starting the unit, the following basic checks must be completed:
- Confirmation of Environment and Equipment Status:Ensure the server room is well-ventilated, free of flammable or corrosive materials, with a dry and clean floor, and located away from areas with high dust concentrations.
- Lubrication System Check:Check that the oil level is above the midpoint of the sight glass and that the oil is clean with no emulsification; replace the dedicated compressor oil at the intervals specified in the equipment manual.
- Piping and Safety Accessory Inspection:Confirm that the air filter is in good condition, the exhaust valve is closed or slightly open, and both the safety valve and pressure gauge are within their legally mandated calibration validity periods.
- Electrical wiring troubleshooting:Check that the supply voltage is within the rated range, that the protective earth conductor is securely connected, and that there are no loose components, signs of moisture, or burn marks inside the control cabinet.
II. Standard Initiation and Operational Monitoring
Power-up and startup procedures may only be carried out after the preliminary checks have been completed. During operation, dynamic monitoring must be performed either through an automated monitoring system or with dedicated personnel on duty:
- Tiered Startup Process:Close the main power switch and verify that the control panel display and self‑diagnostic status are normal. Press the start button to bring the equipment into loaded operation, and closely monitor changes in the ammeter reading and exhaust pressure.
- Core Parameter Monitoring:During operation, continuously record exhaust gas temperature, lubricating oil temperature, and main engine exhaust pressure. It is strictly prohibited to operate the equipment continuously for extended periods when temperatures or pressures exceed their respective thresholds, in order to prevent accelerated wear of the main engine.
- Abnormal Noise and Vibration Troubleshooting:If you hear mechanical friction noises, air leakage sounds, or notice abnormal vibration of the machine body, immediately disconnect the power supply and tag the equipment for maintenance; under no circumstances should it be operated while faulty.
III. Standardized Shutdown and Power-Off Procedures
The correct shutdown sequence effectively prevents condensate backflow and motor overload, significantly extending the unit’s service life:
- Uninstall and run:Gradually close the downstream gas valves, allowing the air compressor to run unloaded for approximately three to five minutes, so that the internal temperature of the unit decreases gradually and residual pressure in the piping is naturally released.
- Stop Host:Press the stop button on the control panel, and disconnect the main power circuit breaker only after the main rotor has come to a complete stop and the fan has slowed down.
- Discharge condensate:After shutdown, open the drain valves at the bottom of the air receiver tank and each stage of the filters to completely drain any accumulated water, preventing corrosion of the inner vessel or pipe rupture due to freezing in cold winter temperatures.
IV. Key Points for Emergency Response and Routine Maintenance
A rapid response mechanism for emergencies is the last line of defense in ensuring safe production. Operators should be proficient in the following emergency and maintenance procedures:
- Emergency Shutdown Procedure:In the event of severe oil leakage, smoking, electrical fire, or a sudden loss of pressure control, immediately press the red emergency stop button, evacuate nearby personnel, and notify the professional maintenance department.
- Regular Maintenance Schedule:Strictly adhere to the replacement schedules for air filters, oil filters, and oil–gas separators; regularly clean dust buildup from cooler fins to ensure that air‑ or water‑cooled systems maintain adequate heat‑transfer efficiency.
- Records Management:Establish a standalone equipment operation logbook to meticulously record daily start-up and shutdown times, fault codes, consumable replacement dates, and inspection results, enabling data-driven traceability and providing a basis for preventive maintenance.